16 SEPTEMBER 2013
BTN also goes out by email every Sunday night at midnight (UK time). To view this edition click here.
The Business Travel News
PO Box 758
Edgware HA8 4QF
United Kingdom
info@btnews.co.uk
© 2022 Business Travel News Ltd.
Originally planned to open in time for the London Olympics, and a summer 2013 date suggested some time back, the 5-star plus Shangri-La hotel in The Shard looks like being further delayed, according to a report in Building magazine. A February 2014 date has been suggested. The Shard is London’s and Europe’s tallest building.
The 202-room hotel occupies floors 35 to 52 of the skyscraper overlooking the London Bridge railway station complex. It will offer four wining and dining options – a gourmet deli on the ground floor, a destination restaurant and lounge on level 35, and a signature bar on level 52. A swimming pool is included.
The fit-out, costing £40m was contracted to John Sisk & Sons, but there seems to have been a falling out. Chorus Group is the successor. www.shangri-la.com
All comments are filtered to exclude any excesses but the Editor does not have to agree with what is being said. 100 words maximum