7 DECEMBER 2009
BTN also goes out by email every Sunday night at midnight (UK time). To view this edition click here.
The Business Travel News
PO Box 758
Edgware HA8 4QF
United Kingdom
info@btnews.co.uk
© 2022 Business Travel News Ltd.
SOUTHAMPTON AIRPORT’S much requested passenger footbridge to the northbound tracks of the adjoining Parkway station was finally opened last week. The existing bridge at the other end of the platform served the long gone original terminal. The new link includes lifts making it much easier for those passengers travelling with luggage or with young children, and providing much needed access for disabled passengers to get from one side of the station to the other. Southampton Parkway is on the main line from Waterloo with the fastest train just 1hr 6mins. www.southamptonairport.com
All comments are filtered to exclude any excesses but the Editor does not have to agree with what is being said. 100 words maximum