4 MAY 2009

YOUR WORDS


Readers are invited to add their comments to any story. Click on the article to see and add.

BTN DISTRIBUTION

BTN also goes out by email every Sunday night at midnight (UK time). To view this edition click here.

Index

Email this Page
Bookmark

The Business Travel News
PO Box 758
Edgware HA8 4QF
United Kingdom
info@btnews.co.uk
© 2022 Business Travel News Ltd.

Article from BTNews 4 MAY 2009

Boeing Dreamliner nears first flight

BOEING’S 787, the much delayed Dreamliner, is nearing its first flight, officially said by the company to be before the end of June.  There is an outside possibility it could make a sensational debut at the Paris – Le Bourget Air Show which starts Monday 15 June but this would mean a disruption to the certification programme, something Boeing might consider overall worthwhile.  Latest reports from Seattle confirm that the first prototype (designated ZA001) has completed a rigorous series of tests including build verification trails, structures and systems integration checks and landing gear swings.  With Chief Pilot Mike Carriker at the controls, all flying controls, hardware and software were tested.  A simulation included take-off plus manual and automatic landings.  During a video conference 787 VP and Chief Project Engineer Mike Delaney said Boeing has "a couple of key things left to do before gaining an experimental flight certificate from FAA to begin flight testing.” www.boeing.com/commercial

Index/Home page
 

OUR READERS' FINEST WORDS (All times and dates are GMT)

All comments are filtered to exclude any excesses but the Editor does not have to agree with what is being said. 100 words maximum


www.btnews.co.uk