Bombardier has signed a contract to supply eleven Bombardier TRAXX electric locomotives to Koleje Mazowieckie – KM. The two cab electric locomotives are planned to pull the KM double-deck coaches in a push and pull operation in the Mazovian region of Poland.
The trains can reach speeds of 160 kmh and the new locomotives are due for delivery in 2011. www.bombardier.com
All comments are filtered to exclude any excesses but the Editor does not have to agree with what is being said. 100 words maximum